I had a little time in the shop last night and was able to get the legs cut, shaped and sanded. I also took off most of the first pass of stain. My wife and I then proceeded to beat the heck out of the table top and today I will finish sand the top and re-stain everything. However first I am going to layout the skirting on the bottom of the table and use a method I haven't used before for attaching table tops. I am going to use the Kreg Pocket hole system to attach it. I am trying different ways of attaching the tops so that I can decide which way I like best. Once I have that all together I will stain the top and then the base separately and then attach the two.
Below are a couple of updated pictures
Friday, January 22, 2010
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment